304 Sex Toy Love Balls Stress Ball

Products

HomeHome / Products / Stress Balls / Details
304 Sex Toy Love Balls Stress Ball

304 Sex Toy Love Balls Stress Ball

Package Size 1.00cm * 1.00cm * 1.00cm Package Gross Weight 1.000kg 304 Sex Toy Love Balls Stress Ball Introduction: 1. T

Send your inquiry

DESCRIPTION

Basic Info.
Model NO. stress ball
Universal Yes
Type Bearing Ball
Material AISI 304/AISI304L Stainless Steel Ball
Magnetic Much Little
Application Valves, Aerosol, Finger Pumps
Conditioning Dry or Oiled
Structure Solid Stainless Steel Ball
Packaging Standarded or as Customer Required
Hardness 25-39 HRC Stainless Steel Ball
Characteristic Very Good Resistance to Corrosion(Apart of Solfori
Spec.Weight 7.972g/Cm^3 Stainless Steel Ball
Grade G40-700 Stainless Steel Ball
Size 19.05mm 3/4′′ Stainless Steel Ball
Transport Package Box, Plastic Bag, Steel Drum
Specification BV
Trademark SUHUA
Origin Jiangsu China
HS Code 8482910000
Production Capacity 300 Tons Per Month
Packaging & Delivery
Package Size 1.00cm * 1.00cm * 1.00cm Package Gross Weight 1.000kg
Product Description

304 Sex Toy Love Balls Stress Ball


Introduction:
1. This is only austenitic steel for ball manufacture and can be non magnetic.2. 316L stainless steel ball has a lower carbon content than 316 stainless.3. Applications for type 316L balls include Jewelry and medical uses.
Application:

304 Sex Toy Love Balls Stress Ball



Detailed information:

Stainless steel ball AISI304
1. MaterialAISI 304/ SUS 304/ Wks 1.4301
2. Size Range1mm-180mm
3. GradeG40-1000
4. Hardness25-39 HRC
5. Characteristic(a)Good resistance to corrosion(b)Apply in where material toughness and resistance to corrosion are more important than hardness(c)Good corrosion resistance in the food environment, oxidizing solutions and most organic chemicals
6. MagneticMuch little
7. ApplicationValves, finger pumps,Aggressive applications without mechanical efforts
8. Chemical composition
C%Si% Mn%Cr% Ni%P%S% N%
min.---------17.08.0---------
max.0.071.002.0019.510.50.0450.0150.11
9.PackingStandard: 10kg or 20kg per carton,1 ton per pallet or as customer required
10.Conditioning dry or oiled
11.Delivery timeStock within a short time or 35 days.
CHANGZHOU HUARI STEEL BALL CO., LTD.

Production process:

Manufacture process of steel balls
Step 1 HeadingBalls blanks are cold headed from rolls of wire.
Step 2 FlashingRolling balls between two hard alloy plates to removes the slight bandand small protrusions.
Step 3 Heat treatmentHeating balls to a high temperature in furnace and quenching balls in a liquid bath.
Step 4 Rough grindingRolling balls between the face of a fixed iron plate and a very hard fire-grit grinding wheel. Then rolled the hardened ground balls between two cast iron plates.
Step 5 CleaningThe final production operation cleans the finished balls and adds a shiny luster.
Step 6 Final InspectionBalls are gauged, visually inspected and subjected to other quality tests to insureevery customer's specifications are achieved.
Step 7 PackagingThe balls are packaged in accordance with customer specifications for shipping.


Packaging:
Type 1: Plastic bag + box + carton + wooden pallet
Type 2: Plastic bag + carton + wooden pallet
Type 3: Our package: export cartons, steel drums, wooden pallets
About us:
1. Established since year 1986, more than 27 years experience and specialized in steel balls manufacturer and ball related products.
2. High precision instruments and technical staffs.
3. Offer the good quality service and product with short delivery times.


Services:
1. All the inquiries will be reply within 24 hours2. For the steel ball, please kindly let us know the size, material, grade and quantity.3. For the bearing, please kindly let us know bearing type, material, Accuracy Grade/Class, and quantity.
Certification:

304 Sex Toy Love Balls Stress Ball


Exhibition:FAQ:

Q1: What kind of ball can supplied by Huari?

A: Stainless steel ball, Chrome steel ball, Carbon steel ball, Brass ball, Aluminum ball, Copper ball, coated ball.


Q2. What is your terms of payment?

A: T/T 30% as deposit, and 70% before delivery.


Q3. What is your terms of delivery?

A: EXW, FOB, CFR, CIF.


Q4: How many days for delivery?

A: Inventory with 1-3 days or 25-30 days. The specific delivery time depends on your quantity.
Any futher query, please do contact us anytime.